Pump Technology Catalogue 2019

The DRAINKING comes complete with a one year warranty. In the unlikely event of technical difficulties, please ring: Pump Technology Limited on 0118 9821555 INSTALLATION DRAINKING Installers please note. (use solvent weld or copper pipe) COMMISSIONING: It is ESSENTIAL that a Twin Pump System is commissioned by Pump Technology engineers after installation. Please discuss details with our Technical Department. 1. Remove lid from tank, check pump is correctly positioned and connecting pipework has not been damaged in transit. 2. All inverts should be brought into the tank by drilling a hole and using an appropriate tank connector. 3. All inverts should be brought into the tank (using tank connectors) at the highest possible level from the floor - i.e. no lower than 260 mm from centre of hole to floor. 4. Preferably no connections through the lid as this inhibits easy removal of the lid for cleaning tank. (Note: tank should be positioned in such a way that lid can be removed easily for maintenance.) 5. Ensure that the inflow of water is not directed onto the float mechanism. 6. Slow radius bends MUST be used for every change of direction of the discharge pipework. 7. If the discharge pipework connects to a soil stack, manhole etc. below the discharge outlet of the tank, an anti-syphon unit MUST be fitted to the highest point of the discharge pipework. 8. The tank should be positioned so that the lid can be removed for easy access to pump and tank interior for cleaning. VENTING TO AIR: THE TANK MUST BE VENTED TO AIR (1¼" MIN.). DO NOT USE A DURGO / AIR ADMITTANCE VALVE . IF GLASSWASHERS OR COMMERCIAL/INDUSTRIAL DISHWASHERS/WASHING MACHINES ARE USED IT IS RECOMMENDED THAT AT LEAST A 2" VENT IS TAKEN TO AIR. (IF YOU WISH TO DISCUSS YOUR PARTICULAR APPLICATION WITH REGARD TO VENTILATION PLEASE CONTACT OUR TECHNICAL SALES DEPARTMENT.) MAINTENANCE: The DRAINKING should have the lid REGULARLY removed for CLEANING of the Tank and Pump Due to a policy of continuous product improvement we reserve the right to alter specifications without notice. IMPORTANT: This unit is not designed to handle sewage. Please enquire about our packaged sewage pumping systems. DRAIN-KING: This consists of a durable tank manufactured from polyester/glass fibre (GRP) laminate, fully rigged with internal pipework, non return valves etc. for Single or Twin Pumps. QUALITY: The tank is pigmented throughout with an externally smooth isophthalic polyester gel coat and resin enriched lining. DISCHARGE OUTLETS: Have a 2" Male BSP male thread outlet. INVERTS: See Installation Notes. PUMP Type: Vertical single-stage, submersible with free inlet, volute casing with 1½" (female) pressure branch, open centrifugal impeller, (30 mm solids handling capacity). Motor: Submersible, oil filled motor, type of enclosure IP68, insulation class B, starting via plug or automatic circuit. Materials: Spiral casing in cast iron - Terminal board, hood, impeller, wear plate made of GRP. Motor casing and shaft of stainless steel, supply through rubber insulated flexible cable. Bearings: Common shaft for pump and motor, mounted in ball bearings. Shaft Seal: Silicon carbide mechanical seal, oil chamber and double shaft seal towards the motor section, safe to run dry. Depending on the working environment of the DRAINKING , it may be advisable to fit a grease trap/interceptor. Please seek advice from our technical department. Phone 0118 9821555 for further information. PTL 730 ‘H’ version available for extremely hot water. Check specifications with our Technical Department. PTL 730D 3 -phase 400V 0.85kW 0.60kW 1.4A 2800 30mm PTL 730E s ingle phase 230 V 0.83kW 0.50kW 3.9A 2 500 3 0mm PTL1030D 3-phase 400V 1.36kW 1.06kW 2.4A 2740 30mm PTL 1030E s ingle phase 230 V 1.37kW 0.98kW 6.0A 270 0 30mm Incorporated in motor (thermostat) Technical Data (50 Hz) Type P1 P2 F.L.C. RPM Overload Protection Max. Solids Size Voltage PTL 60E single phase 230 V 0.70kW 0.45kW 3.4A 2600 10mm PTL60D 3phase 400V 0.75kW 0.60kW 1.3A 2800 10mm 1 4

RkJQdWJsaXNoZXIy MzQ4Mjc=